Home
 

Summer 2012:  Opening Breuil-Cervinia 30/06 to 09/09 and Valtournenche 14/07 to 02/09                Summer 2012:  Opening Breuil-Cervinia 30/06 to 09/09 and Valtournenche 14/07 to 02/09



  • RSS

NEW CABLE CAR

Nuova funivia per Plateau Rosà
The new Plateau Rosà cable car: Better comfort, better views and great fun! Again the 3,500 metres of Plateau Rosà tells the story of great skiing...

The new cable car, futuristic design with maxi windows ensuring spectacular views during your ride, the future is here from this winter! It's not only for skiers...

Over the Summer 2010 the first technical works were carried out to guarantee the general revision of the lift. The Spring of 2011 will see the continuation of the works and the replacement of the electronic and electromechanical parts, to be completed before the Summer opening on the 2nd July 2011 and over the autumn break the vehicles will be replaced. Breuil-Cervinia winter 2011-2012 will open with this fantastic new technology!